Back to Projects
Master & Hall Bath Remodel

Master & Hall Bath Remodel

A full remodel of both the master and hall bathrooms. The master bath was taken down to the studs and reconfigured for a curbless walk-in shower with heated floors, dual shower heads (including a rain head), and a freestanding spa tub with heated controls — plus a redesigned closet layout for maximum storage. The hall bath got a full tub and surround replacement, new vanity, pocket door upgrade, and removal of an old exterior staircase and door. The Pocket, Sacramento, CA.

Before
Master bath demo — full gut to studs
Before
Rough framing & drywall — reconfigured layout
After
Curbless shower with full-height tile
After
Freestanding spa tub with heated controls
After
Master double vanity with quartz counters
After
Linen storage & toilet area
After
Hall bath vanity & new flooring
After
Hall bath — new tub & tile surround

Have a similar project in mind?

We'd love to hear about it. Get in touch for a free, no-obligation consultation.

Request a Quote